Selected Recent References
Neom, Saudi-Arabia
Neom, the”Line” is the world’s largest construction project. Geotechnical and hydrological engineering work was performed in the west section, the “Hidden Marina” and the “Hanging Tower”
La Quebrada Copper Mine, Chile
Geological Exploration and Reporting on the west section for future mine extension. Management of drilling program.
Trans-Canada Pipeline
In the section Kamloops, geotechnical and geological evaluation was performed for several pipeline tunnels and connector as well as pump stations.
Geological and Geophysical Oil Exploration, Cataumbo Basin, Colombia
The Catatumbo Basin in Colombia geologically forms part of the Maracaibo Basin in Venezuela and is an exceptionally oil-rich shale. Geophysical and geological opinion letters and a NI 51-101 report was provided.
German High Speed Railway Track Frankfurt – Hannover
DBB, the German federal railway company is planning a 32 kms high-speed railway track where trains reach a speed of up to 300 kms/h. Geotechnical and geological work was performed to determine foundations and settlements.
EVN Power Plant Krems – Austria
The Austrian energy company built a new power plant in the city of Krems, Austria. Geotechnical work was performed to determine and calculate the foundations. Hydrological work was as well performed, as part of the foundations were built below the groundwater level.
Felbertauern High Alpine Road Bridge Section Daberbach III, Austria
The Daberbach bridge III was extended by one lane, and a pedestrian bridge section added. Geotechnical field work and modelling and calculations were performed to determine foundations and slope stability.
Geoscience Data Analysis Project for Microsoft, Redmond, USA
A large data set consisting of remote sensing satellite data was analyzed and prepared for an artificial intelligence project.
Geoscience Data Analysis Project for Google, USA
Large data sets, consisting of satellite images, were processed and analyzed and prepared for a Google Earth machine learning project.
ÖBB Highspeed Railway Bridge and Tunnel, Patscherkofel, Austria
The Austrian federal railway company ÖBB has a high-speed railway line, which in its North section consists of a bridge and a tunnel through a major mountain. Geotechnical and geological work was performed to determine tunnel stability and bridge foundations.
University Hospital Sankt Pölten, Austria
The North part of the university hospital has been completely rebuilt. Geotechnical, geological and hydrological work was performed to calculate and determine foundations. Hydrological work was performed to mitigate the effects of groundwater.
Power plant Waste Deposit, Timelkam, Austria
The Timelkam power plant has deposited ashes from its operations on waste site. The waste body became unstable and showed signs of disintegration. Geotechnical calculations and geological work was performed and a renovation proposal was submitted.
Water Pipeline, Jeddah – Riyadh, Saudi-Arabia
This dual water pipeline transports drinking water from a desalination plant at the Red Sea near Jeddah. Geotechnical calculations and geological work was performed and construction supervision as well as audit services provided.
Frontino Gold Mines, Colombia
The Frontino operations extend up to 900 meters below surface and are a massive mining operation. A study was performed to extend the mining into the northern areas, called the Guadeloupe project. Geotechnical calculations for mine stability were presented.